SIMULATION OF HYDROPOWER ENERGY GENERATION - 7 Angebote vergleichen
Preise | 2013 | 2014 | 2015 | 2019 | 2023 |
---|---|---|---|---|---|
Schnitt | € 53,73 | € 52,14 | € 60,70 | € 44,89 | € 48,99 |
Nachfrage |
1
Symbolbild
Simulation of Hydropower Energy Generation
DE PB NW
ISBN: 9783639232066 bzw. 3639232062, in Deutsch, VDM Verlag, Taschenbuch, neu.
Von Händler/Antiquariat, BuySomeBooks [52360437], Las Vegas, NV, U.S.A.
Paperback. 108 pages. Dimensions: 8.7in. x 5.9in. x 0.2in.Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd. , for technical knowledge sharing internationally. This item ships from multiple locations. Your book may arrive from Roseburg,OR, La Vergne,TN.
Paperback. 108 pages. Dimensions: 8.7in. x 5.9in. x 0.2in.Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd. , for technical knowledge sharing internationally. This item ships from multiple locations. Your book may arrive from Roseburg,OR, La Vergne,TN.
2
Symbolbild
Simulation of Hydropower Energy Generation (Paperback) (2010)
DE PB NW RP
ISBN: 9783639232066 bzw. 3639232062, in Deutsch, VDM Verlag, Germany, Taschenbuch, neu, Nachdruck.
Von Händler/Antiquariat, The Book Depository EURO [60485773], London, United Kingdom.
Language: English Brand New Book ***** Print on Demand *****.Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.
Language: English Brand New Book ***** Print on Demand *****.Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally.
3
Symbolbild
SIMULATION OF HYDROPOWER ENERGY GENERATION (2010)
DE PB NW RP
ISBN: 9783639232066 bzw. 3639232062, in Deutsch, VDM Verlag Jan 2010, Taschenbuch, neu, Nachdruck.
Von Händler/Antiquariat, AHA-BUCH GmbH [51283250], Einbeck, Germany.
This item is printed on demand - Print on Demand Titel. Neuware - Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally. 108 pp. Englisch.
This item is printed on demand - Print on Demand Titel. Neuware - Power Generation is essentially required for improving and maintaining the infrastructure of the overall development of a nation. It is the tool to forge the economic growth of any country. Spat Gah-Gabarband Gah valleys consisted of Upper Spat Gah (US), Middle Gabarband (MG), both with dams, and Lower SpatGah (LS) stage as a runoff river scheme and run almost parallel in east west direction for about 30 km, up to their zenith at elevation 2800 m. The project aims for development of a high head hydropower scheme, located on the left bank of the Indus River in Kohistan district (NWFP). The main objective of this study was development and optimization of Lower Spat Gah (LS) scheme in cascade and simulation of energy generation at with and without addition of the Upper schemes of the cascade. Finally simulation results are presented in this book and recommendations were drawn for researchers and planners. The author appreciate the efforts of Barthlemy Chaton and his team in facilitating and highly acknowledge publishing of it by VDM Publishing House Ltd., for technical knowledge sharing internationally. 108 pp. Englisch.
4
Symbolbild
Simulation of Hydropower Energy Generation (2014)
DE PB NW
ISBN: 9783639232066 bzw. 3639232062, in Deutsch, BLUES KIDS OF AMER 01/09/2014, Taschenbuch, neu.
Von Händler/Antiquariat, Books2Anywhere [190245], Fairford, GLO, United Kingdom.
New Book. This item is printed on demand. Shipped from UK. This item is printed on demand.
New Book. This item is printed on demand. Shipped from UK. This item is printed on demand.
5
Symbolbild
SIMULATION OF HYDROPOWER ENERGY GENERATION (2010)
DE PB NW RP
ISBN: 9783639232066 bzw. 3639232062, in Deutsch, VDM Verlag Dr. Müller, Saarbrücken, Deutschland, Taschenbuch, neu, Nachdruck.
Von Händler/Antiquariat, English-Book-Service - A Fine Choice [1048135], Mannheim, Germany.
This item is printed on demand for shipment within 3 working days.
This item is printed on demand for shipment within 3 working days.
6
SIMULATION OF HYDROPOWER ENERGY GENERATION
DE HC NW
ISBN: 9783639232066 bzw. 3639232062, in Deutsch, VDM Verlag Dr. Müller, gebundenes Buch, neu.
Lieferung aus: Deutschland, Versandkostenfrei, Shipping in 1-2 weeks.
Die Beschreibung dieses Angebotes ist von geringer Qualität oder in einer Fremdsprache. Trotzdem anzeigen
Die Beschreibung dieses Angebotes ist von geringer Qualität oder in einer Fremdsprache. Trotzdem anzeigen
7
SIMULATION OF HYDROPOWER ENERGY GENERATION (2010)
~EN PB NW
ISBN: 9783639232066 bzw. 3639232062, vermutlich in Englisch, VDM Verlag Dr. Müller, Saarbrücken, Deutschland, Taschenbuch, neu.
Lieferung aus: Deutschland, Next Day, Versandkostenfrei.
Die Beschreibung dieses Angebotes ist von geringer Qualität oder in einer Fremdsprache. Trotzdem anzeigen
Die Beschreibung dieses Angebotes ist von geringer Qualität oder in einer Fremdsprache. Trotzdem anzeigen
Lade…